Grid seeking remedy to cable issue #RI

World News: . []

The sea2shore transmission cable, installed by National Grid as part of the Block Island Wind Farm project, can now be seen about 25 feet from Town Beach at low tide. The cable, which is yellow and black, was getting some attention on the morning of Wednesday, Aug. 8. The cable connects Block Island to the mainland. Beachgoers were floating and swimming above the cable, which at low tide was about three feet below the water. The exposed section of cable . . .

Read More: https://www.wind-watch.org/news/2018/08/10/grid-seeking-remedy-to-cable-issue/

Published: .

Search for other references to "grid" on SPi News


Share

Previous StoryNext Story

SPi News is published by Sector Publishing Intelligence Ltd.
© Sector Publishing Intelligence Ltd 2018. [Admin Only]
 
Sector Publishing Intelligence Ltd.
Agriculture House, Acland Road, DORCHESTER, Dorset DT1 1EF United Kingdom
Registered in England and Wales number 0751938.
 
Privacy Policy | Terms and Conditions | Contact Us